Electrification on Southern Railway 1375.
SHRl O. V. ALAGESAN: Will the Minister of RAILWAYS be pleased to state:(a) what is the present stage of construction of Madras-Vijayawada and first phase of Madras-Arakkonam viz., Madras-Tiruvallur schemes of electrification on the Southern Railway and when will they be completed;(b) when is it proposed to take uP the second phase viz., Tiruvallur- Arakkonam electrification; and(c) whether it is proposed to set apart the present double line electri* fied cn the Madras-Tiruvallur and the MactraS'Gummidipoodi suburban sections for electric train service and lay separate lines for main line traflBc on the above short stretches?THE MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI SHEO NARAIN): (a) By the end of September 1978 62,2 per cent of electrification works of Madras-Vijayawada section and S5.45 per cent of Madras-Trivellore section have been completed. Electrification of both the sections is likely to be completed during 1979-80
(b) It has not been decide<I to take up electrification of Trivellore-Arko- nam section so far.(c) There are no such proposals
https://eparlib.nic.in/bitstream/123456789/2225/1/lsd_06_06_28-11-1978.pdf Page 125
SHRl O. V. ALAGESAN: Will the Minister of RAILWAYS be pleased to state:(a) what is the present stage of construction of Madras-Vijayawada and first phase of Madras-Arakkonam viz., Madras-Tiruvallur schemes of electrification on the Southern Railway and when will they be completed;(b) when is it proposed to take uP the second phase viz., Tiruvallur- Arakkonam electrification; and(c) whether it is proposed to set apart the present double line electri* fied cn the Madras-Tiruvallur and the MactraS'Gummidipoodi suburban sections for electric train service and lay separate lines for main line traflBc on the above short stretches?THE MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI SHEO NARAIN): (a) By the end of September 1978 62,2 per cent of electrification works of Madras-Vijayawada section and S5.45 per cent of Madras-Trivellore section have been completed. Electrification of both the sections is likely to be completed during 1979-80
(b) It has not been decide<I to take up electrification of Trivellore-Arko- nam section so far.(c) There are no such proposals
https://eparlib.nic.in/bitstream/123456789/2225/1/lsd_06_06_28-11-1978.pdf Page 125
கருத்துகள் இல்லை:
கருத்துரையிடுக