Electrification on Southern Railway 1375.

 SHRl O. V. ALAGESAN: Will the Minister of RAILWAYS be pleased to state:(a) what is the present stage of construction of Madras-Vijayawada and first phase of Madras-Arakkonam viz., Madras-Tiruvallur schemes of electrification on the Southern Rail­way and when will they be complet­ed;(b) when is it proposed to take uP the second phase viz., Tiruvallur- Arakkonam electrification; and(c) whether it is proposed to set apart the present double line electri* fied cn the Madras-Tiruvallur and the MactraS'Gummidipoodi suburban sec­tions for electric train service and lay separate lines for main line traflBc on the above short stretches?THE MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI SHEO NARAIN): (a) By the end of September 1978 62,2 per cent of electrification works of Madras-Vija­yawada section and S5.45 per cent of Madras-Trivellore section have been completed. Electrification of both the sections is likely to be completed dur­ing 1979-80

(b) It has not been decide<I to take up electrification of Trivellore-Arko- nam section so far.(c) There are no such proposals

https://eparlib.nic.in/bitstream/123456789/2225/1/lsd_06_06_28-11-1978.pdf Page 125

கருத்துகள் இல்லை: